Roof cover with your own hands. How to put a straightfist on the roof. Phased mounting of the roof of the corrugated

Work with the professional flooring is convenient and simple. The thing is that it has a small weight, and the size of the sheet allows you to cover immediately a large roof area. In addition, the material is soft, the fastening is simple, so you can take on the equipment of the roof alone. No need to be afraid. Two main rules that will help in work:

  • follow step by step guide;
  • to avoid possible errors, We will tell you in detail in the article.

Working with a professional flooring is relevant today, search engines sites will be full of thousands of new requests like "Crow the roof of a straightened."

Selection of material

Approaching the choice roofing material, initially go through everything possible options. There are quite a lot of them on the Russian market, and the benefits of everyone should be known to the one who approached the roof covering the roof. This issue is important:

  • material cost;
  • its quality and durability;
  • appearance.

Deciding to use precisely professional flooring, remember that the material must necessarily be roofing, that is, to have a groove for rapid sediment. Brand also has a value.

  • C - wall;
  • H - roofing;
  • CH - universal.

Professional flooring - universal material, use it everywhere. Due to the growing popularity and number of sales, manufacturers produce new products of bright colors and interesting design. The advantages of using it as roofing material are obvious:

  • ease;
  • the presence of corrosion protection;
  • affordable price;
  • ease of installation;
  • ensuring the roof waterproofing.

A roof covered with a professional flooring can give to leak only in the presence of serious mechanical damage, for example, as a result of the fall of the heavy branch of the tree. In general, the durability of the coating is one of the most favorite qualities.

The sheet of professional flooring consists of several layers providing its protection:

  • zinc coating;
  • anti-corrosion layer;
  • soil coating;
  • polymer coating.

On top also apply a protective film, which is removed after installation. Overview of various brands of professional flooring that can be used for the roof is shown in the video.

Self installation

Detailed description self-laying Professional flooring on the roof will help any newcomer to cope with the task. For standard duplex roofing houses of 10 for 10 meters, two people will cope with a task in two days. This will save money and gives certain experiences, which is useful subsequently.

When transporting, loading and unloading work, be careful. If the sheet is damaged, it will be necessary to replace it, which entails additional costs. Correct bend it is impossible. When lifting a professional flooring on the roof uses lags. You need to lift one sheet.

You can walk on label sheets with sheets, but it is necessary to do it carefully: to come only to places, under which there is a doom in shoes with a soft sole.

Preparatory process

For those who only started the root raising process, the short video is below for familiarization. We will start with the fact that it will take a crate for attachment. Pre-create thermal insulation and cover the roof with waterproofing material.

The work is made in this way:

  • the vapor insulation material is laid under the rafter;
  • in severe frosts in the region, insulation is paved;
  • the waterproofing material is placed on the rafter;
  • install the counterclaim and the crate.

All this is called "Roofing Pie". To the first board of the crate on the edge of the roof, it will be necessary to secure the cornice bar for which water will be drained.

Doomnet and counterclaim - mandatory elements. Before laying out them, you need to process with a special solution against wood rotting. The presence of insulation materials will further reduce heat loss through the roof.

Necessary materials

You need to prepare tools and materials in advance so that you are not distracted by trifles. So, make a list:

  • sheets of professional flooring (it is best to use sheets with a long-line roofing skate, as stated on the first introductory video);
  • lags (serve to lift roofing material on the roof);
  • roofing screws for fastening;
  • portable screwdriver;
  • gloves.

Profile sheets are calculated and cutting off on Earth. Back to top are delivered for fasteners. Separate places handle anti-corrosion primer. As for the screws, it is better to use special, since they are equipped with a rubber seal that does not allow moisture to flow under it. Also, the convenience of using them is that it is not necessary to drill a hole in advance, and the caps are painted in different colors In the color of the professional flooring. The flow rate of the sizes of 4.8 * 28 mm is 6-7 pieces per 1 m 2 of the material.

Tip! Use a screwdriver with a battery, it is not heavy and does not require further pull extension cord.

Safety regulations

It is important and compliance with the rules of security, because work at an altitude is conjugate with a number of difficulties and dangers. Store the following rules:

  • it is forbidden to cover the roof of a professional flooring in windy weather;
  • be sure to use tight gloves to avoid cutting with material;
  • for lifting and descent use potter stairsenshrined in two places;
  • work without insurance on the roof is prohibited;
  • if it started rain, all work is stopped until the roof is completely drying;
  • when moving along the fixed sheets, the leg is put in the groove;
  • after work, remove all the garbage and tools.

If you follow this list of rules, you can avoid injuries that, unfortunately, are often found when working newbies.

Features of laying professional flooring

Mounting work starts with the installation of a cornice plank. Very often forget about it. When installing the corrugated floor, the angle of inclination of the roof is taken into account. If he does not reach 15 degrees, the professional flooring has twisted 20 centimeters. The angle of up to 30 degrees allows you to cover the brass at 15 centimeters, and for angle above 30 degrees can be reduced to 10 centimeters. Keep in mind that the minimum overlay size can be considered the size of a single wave, which is convenient in operation.

You can start work both on the right and left. For holm roofs begin work from the middle of the hip.

Work process

Gently raise sheets on the roof, lay them and align. In the video "Cruem Roof in the Garden" is shown roofing work.

The fastening of the professional flooring with the crate should be carried out in the groove, and not at the top of the wave, it is then that fasteners will be reliable. Bottom go up to the skate. In this place of the roof you need to use a halter of a large length. As a rule, it is 80 millimeters.

If the skate length is very big, and the roof is not so far, you will have to work with a smaller professional flooring. At the same time, it stacked from bottom to top. This prevents moisture from entering it.

End strips and elements of the skate are mounted upon completion of all works. Previously in the area of \u200b\u200bthe skate leave a small gap, which is needed for ventilation. Despite the fact that there are a lot of photos and videos on the Internet with details of working with a professional flooring, newcomers often allow mistakes when installing.

The most common mistakes

Part of the errors are presented in the video below, they concern the sequence of installation of the joints of the corrugated floor.

In addition, it often makes errors when working with a professional flooring in the field of endands, skate and pipes. Newbies cut out and bent metal special forms, although it is not necessary. Manufacturers specially produce false elements from this material To facilitate the task.

No need to invent something, it's easier to buy a ready-made element from the corrugated floor and consolidate it on the roof that will be reliable. Otherwise, there is a risk of leakage and rust formation over time. Mounts are required to be carried out. To the attention of those whose roof is equipped with chimney pipes: the smoke is installed in addition to the pipe (you can pick up a color).

Roofing work with a profile is simple, it is quite possible to do it yourself. The most important thing is to follow the instructions and comply with the security technique. Then your roof will be one of the most beautiful!

The profiled metal sheet is a very common roofing material in industrial construction, but more recently, this coverage has fallen in love with private developers. Properly laid roofing from the corrugated floor has very good operational qualities. The use of some metals allows not to take care of its maintenance and repair, because it can serve until 150 years. In this article, you will learn how the roof is stacked from the corrugated floor, its varieties, properties and characteristics.

Marking professional flooring

Profiled Metal Sheet - Unique construction material . Thanks to him, it is possible to create bases for other types of coatings, use as a material for non-removable formwork or to build a fence.

In the process of production, the surface of the professional flooring is covered with various polymers, which protect the metal from corrosion and give the material different shades, but there are more simple viewswhich do not have such protective layers.

The labeling of profiled sheets does not have a complex symbolism.

  • FROM - means that such material can only be used as components of sandwich panels, when wearing walls or a fence device
  • Letter " N."So - carrier. Such a sheet is applied when equipped failure formwork or as roofing
  • The combination of both letters " Ns."It assumes that such a product is universal and is suitable for all possible work.

In addition to the letters in the marking there is a digital designation. They show the sheet parameters, for example, C-50-0.6-845-6000, where 50 mm is the height of the corrugations, the thickness of the steel is 0.6 mm, width and length 845 mm and 6000 mm, respectively.

It is necessary to carry out the corrugation on the roof only a mustache, therefore, the width of the laid material will be slightly smaller. This nuance will be useful to you during the calculations.

If you do not know the marking of the professionalist, you can measure the height of the corrugations. If the obtained value lies in the range from 2 to 16 cm, this is the carrier type, and if from 0.8 to 13.5 cm, then such a metal can be used as walls for fences.

Advantages of professional flooring compared to other roofing coatings

Modern construction offers a very choice a large number of Roofing materials and often decrees are very difficult, so I wrote a small list of advantages of professional flooring in front of other coatings for the roof.

  • High strength and stability in relation to external influences. These properties allow the material easily to cope with emerging loads from wind, rain and snow. Ultraviolet radiation and small mechanical effects do not affect the service life
  • The weight of the coating is rather small, only 10kg / m 2. Thanks to this quality, there is no need to build a complex rafter system, for example, as when laying natural tiles
  • A wide range of. Manufacturers of this building material can offer you different types And coloring, but more importantly, it is used metal. After all, when using different raw materials, the deadlines will differ significantly from each other.
  • Durability. The lowest life metal roof - 50 years. Of course, if all the installation rules are met
  • Easy installation. The sheet of professional flooring has quite large sizes, therefore, the filling of them roofing space will take very little time
  • Cheapness. Here, the profiled sheet is compared with metal tiles, which has almost identical properties, the difference is only aesthetics

How to choose the material

When the roof from the professional flooring is stacked with their own hands, then it is necessary to make some calculations and definition good material To cover the roof is one of the most important tasks of the developer. For proper selection You will need to know the following parameters:

  • Profile must have labeling H or NS
  • The thickness of the sheet material should be at least 0.5 mm
  • As a rule, the corrugation is taken from the range of 20-75 mm
  • For ease of moisture removal, the material must have a capillary groove
  • If you are important to an aesthetic look, then take the product covered with polymers, but if you are looking for a coating for a temporary structure, it is better to use the simplest professional flooring. It will save you a lot of finance
  • When buying roofing, carefully inspect it for scratches and chips

Calculation of material requirements

No work in construction can begin without preliminary calculations. At this stage, it is important to determine the future costs of material, time and strength.

If your comfort has double roof, Consider you were lucky. This kind of roof is very convenient for calculations, but if you have a more complex rafter system, for example, a hip or tongs, then you have to break your head a little.

But I can delight you, today manufacturers of roofing materials allow you to make a calculation of the need for materials on their computers, it is enough for them to know the necessary dimensions. This method allows you to determine as accurately as possible how much material will leave onto a particular plane.

If you consider everything manually, and you count the complex type of roof, then for simplicity and accuracy on the plan, highlight the main figures, and then find them area. After that, all the results obtained are summarized and obtained, which is divided into sheet material parameters. So there is a quantity. By the way, with such calculations, do not forget about the backstage, because he "eats" some width of the sheet and you may not have enough material.

In addition to roofing, it is calculated at this stage. drainage system, Stores, pipes and all other small details.

Tools for installation works of professional flooring

For convenience, I wrote a small list of basic tools that can be useful in the process. mounting work.

  1. I consider electronics in the most important tool. Such a tool will make it possible to separately divide the profiled sheet to the necessary dimensions. Using this tool, you will get a maximum incision.
  2. Scissors for metal. Of course, an electribal is a good thing, but sometimes there is a need to cut such places where this apparatus is simply not reaching
  3. Roulette and marker
  4. Screwdriver. Such a tool will be useful to you only when you use the screws as fasteners
  5. Fasteners. Here you can use different products, but tend to use self-tapping screws that have polymer seals and washers.
  6. Well, where to do without a hammer, standard hacksaw with small teeth and screwdriver

The rafting system is a complex structural part of the roof, so when working on it, it should be observed a limiting concentration and safety technique.. The working clothes do not have to flicker movement, the shoes have a non-sliding sole. The mounting belt should be in a functional state, and the safety cable is fixed for a reliable design.

What does the insulated roof look like from the proflist

The insulated roof of the corrugated floor in the context looks like this:

  • Roofing (profiled sheets)
  • Delivered doom
  • Counter-Okeekhet
  • Waterproofing
  • Plates of insulation
  • Inner doom
  • Layer of vapor insulation membrane
  • Plasterboard

When you learned the sequence of layers in a warmed roof using a profiled sheet metal, let me tell you about how they are attached and what parameters should have.

Profile sheets themselves are attached to the crate with the help of screws or self-tapping screws with a rubber lining. Screwing these fasteners should be performed only in the lower wave of the material, and the fasteners of the sheets are carried out in the top, while the crates should not be reached.

The lamp is performed from the tree and must be prepared by antiseptics, however, as all wooden designs. Material for the construction is the boards 32x100 mm or a timber with a cross section of 40x40 mm, and as a counter-crate3x50 mm.

The essence of the counter-crate lies in the fit of the vaporizolation membrane, which is waterproofing. With such an arrangement wooden system It is necessary to take care of creating channels by which air can freely move - this is called ventilation. Without her condensate moisture, and yours will appear slinge system Quickly fail.

The insulation plates are stacked in several layers of the rafter, if the dimensions do not match, then cut the desired piece.

By the way, so that the heat insulation does not fall out need to set a little big sizes and when you shove this material, it will not crawl or fall to the floor.

The inner fence is created in order to hold the heat-insulating plates and create bases for the device of the vapor insulation membrane and drywall.

The roof device from the corrugated hand

Very often from developers, I hear questions about "How to make a roof from a professional flooring?" And so I decided to answer him using the site.

Knowledgeable brigade of the roofers know all ways to lay this material, but if you are going to install a corrugated flooring to the roof with your own hands, then this item is for you.

The process of laying can be carried out only three ways.

  1. In one row
  2. In several rows
  3. On triangular or trapezoidal skates

In the first case, the sheet material begin to lay down the left of the left skate. The first elements are installed taking into account the cornese swells, i.e. Going out for the plane of the roof. Side sheets are temporarily attached to the base for one self-tapping screw, which is located on top. Next, the laying of the material moves up, and to achieve the skate, the process is beginning to be reinstated to the right. After laying the second strip, the first calibrate and firmly fastened fasteners.

I learned several rows about the roof for the roof with my own handwritten on the roof at work with my colleague on the first working day. To do this, we laid profiled sheets from one edge to another, moving horizontally. This method is suitable for those who have no roofing material on the parameters, or it has to trim it. The horizontal backstage should be in the range of 150-300 mm, and if the roof has a small slope to 15 degrees, then all the joints are processed with silicone or other sealant.

Often there are triangular or trapezoid areas on a complex roof. Installation on such places occurs from the center and then goes on both sides at the same time.

The roof of the professional flooring performed with their own hands will have several dozen sites, where the sawt material was produced. Therefore, in order to protect the metal from corrosion should be treated with a special primer. When the material is divided into parts, it is allowed to use only electronics or scissors, the use of other tools, such as grinders, hurts the coating much more.

For fasteners, special screws or screws with washers are used. They have rubber lining, as a result of which maximum sealing of connectors is achieved. The consumption of self-samples is purely individual, but, as a rule, is 8-10 pieces. To give a greater aesthetics, the cap fasteners are painted in the desired color.

Since the roof from the metal does not suppress the noise of falling droplets during the rain, the developers are very often used polyurethane foam seals. They are stacked around the perimeter of sills, closing the corrugation space.

I hope after reading you have become clear how to sharpen a corrugation on the roof with my own hands and now you can go inner further. Now I will tell you how to arrange connecting places.

Installation of eaves, skate and endand

After laying the roofing material on the plane of the roof, the installation work is not eared. Then it is worth getting drawing to the arrangement of eaves, endands and skates. I consider these places exactly because they are the most important. It is with them that the frequent problem of the roof is connected.

To achieve maximum safety from the receipt of moisture in planes in places, it is necessary to organize an additional crate, and there are already enough good elements on them, which are purchased together with profiled sheets, for example, plars of adjoining and infant gutters.

The skating part of the roof must necessarily have a ventilation gap. It will allow air mass freely move in the attic space and remove the condensate. For this, curved slats of the skate node are screwed by self-drawing through the corrugated floor. The gap between them should be approximately 5 cm. Konk himself should cover profiled sheets in both directions at least 10 cm.

I hope now people who ask the question "How to raise profile on the roof?" It will become smaller, because in this article you have learned almost everything you need and are able to make installation with your own hands.

If you have any difficulties, see the video on how to get the roof professional flooring, or consult professional.

For safe accommodation in the house, it is very important to do the installation correctly. roofingThis will avoid the appearance of leaks and provide the owner comfortable accommodation. converge in the opinion that currently more environmentally pure material For the roof of the roofs than the professional flooring does not exist. In addition, this material guarantees the roof a long service life.

After watching the video "", which can be found at the bottom of this article, you will not have any doubts about this. We have hope that watching a video lesson, make you believe in own forcesAnd you decide to start the roof of the roof of the professional flooring yourself.

Before the beginning mounting with your own roofs of a professional flooring It is necessary to determine which sizes has a roof that you have to be covered.

Do not forget that the sheet of professional flooring should descend below the eaves of about 50 mm, therefore, taking into account this and do measurements.

To date, there are several ways to install the roof of the roof of the roof. Learn about them and choose the option of the most suitable, you can, looking into the product catalog.

Try, buy sheets of professional flooring with a long equal length between the roof and cornice. But at the same time, remember that you need to add to this length of 50 mm, because for better coating, the sheets should be laid with a small adhesive.

It is easier and more convenient to raise the lifting and laying of sheets of professional flooring on the roof of a large area, if they are pre-divided into parts.

1. Phased mounting of the roof from the professional flooring

Given the fact that the technology of mounting the roof cover is quite simple, yet, when performing work, you will need the maximum college and clear execution of the recommendations that are specified in step by step instructions to professional flooring.

Professionals advise : Do not forget about the instructions when buying roofing material, it must be provided with the seller. It is worth noting that in it you will find a lot of valuable recommendations, since the manufacturers of goods are interested in how more buyers can buy their products. Therefore, the installation instructions are always in a product of a certificate. In addition, such a product has a manufacturer's warranty, and therefore it is reliable and high-quality.

First stage - laying of the waterproofing layer

Figure 1. Laying the waterproofing layer

It will not take care of the waterproofing, breaking the roof to laying the roof, it means to punish yourself in the following ruble. Rightly laid waterproofing layer will serve reliable protection Roofs from condensate, which is formed due to the air temperature drop. In stores selling material for the waterproofing layer, you can consult the seller about its properties and specifications. This material is placed on the crate between the rafters, even before the installation of the roof begins.

Take care so that the material for waterproofing has resulted a little.

Observe the uniformity of the step on the crates is extremely important, since it will be a professional flooring on it.

Second stage - ventilation arrangement

Figure 2. Establishment of ventilation when installing professional flooring

Most. simple way To equip ventilation, you can call the laying of wooden rails directly to the waterproofing material.

Specialists advise : In any case, perform the improvement of ventilation, since it is impossible to be fully confident that there will be a little moisture between the layerproofing and roofing layer.

Third stage - laying of professional flooring

Figure 3. Laying of professional flooring on the roof

Only after a thorough study of the installation instructions, you can begin to perform the roof of the roof of the corrugation.

2. Installation scheme of professional flooring

It is necessary to make a strong boardwalk flooring at a distance of 60 cm on both sides of the suspension. It is done under the Standa plank at the level of the crate. In this case, there should be a total of more than 20 cm at the bottom boards of the endand.

The bottom plank from the edges is attached with nails. It will be thoroughly fixed with the final roof covering.

We carry out the installation of the bottom plank of the endand. To do this, we make flats or bending the upper end of the end of the roof over the end of the roof.

It is very important that under the slaughter of the plank, it was more than 25 cm. It is also desirable to install an additional universal or profiling seal between the bottom plank of the Enda and the sheets of corrugated.

Experts advise, starting to install the roof of the roof of the corrugated floor, in the case when the rods have the form of a rectangle first install the ending boards. This allows you to facilitate the work on the placement of sheets of professional flooring on the roof. In addition, the upper end board must be installed above the crate, because in the future the end plank will be attached to it. Having done it all, you set up a wind angle.

3. Forest Svet and its installation on the roof

Figure 5. Fantasy Sve and its installation on the roof

After installing the carnice bar and securing it with the help of nails or screws, you can proceed to the cover of the roof of the roof.

It is very important that the waterproofing layer is located above the cornice bar. In this case, condensate from the waterproofing material will fall, bypassing the cornice bar directly to the ground.

If it is assumed that the shelves of roofing material will rely on the cornice bar, then before independently the roof of the roof is needed to take care of the ventilation device in the space under the roof. This will help avoid accumulating water vapor. In addition to ventilation, specialists are advised to perform the installation of the sealer under the professional floor, better if it is passing the air.

4. Options for the device of the carnis

Figure 6. Outskirts

Each subsequent sheet of professional flooring covers the previous, combining drainage chutes, which has this type of roofing material. It is worth noting that the installation can be installed from any of the sides, both on the right and left. In other words, you can slip the subsequent sheet under the previous one, and you can put it on top of the sheet.

If your roof is common, then producing an independent coating of it with a professional flooring, do not forget to go over one wave of sheet and lay a longitudinal gasket for sealing. If you do not have such a gasket, it is better to go to two waves.

If the installation is made on the roof having cool rods, you can do without a longitudinal seal, in this case it is quite suspicious by one wave.

From the type of roof design of the roof depends, in which sequence will be placed by the profiled sheets. For example, from the end of the roof begin laying on the roof having two skates, and performing installation walm roof, Starting the professional flooring is necessary from the center of Walma.

It is very important that the sheets are laid in exactly, so they must be aligned with the cord stretched along the eaves. Some make a mistake, adhering to the alignment of the end of the skate.

We recommend watching the video "Roof from Profile." During the viewing, it will not be difficult for you to make sure that the sequence of work on the installation of the professional flooring is very similar to the sequence of work on styling metal tile.

Meanwhile, note that the length of the eaves should not be less than 4 cm. Laying the first sheet, for greater convenience, secure it in the middle with a screw. Similarly, run the stacking of several more sheets.

Figure 7. Installation of sheets of corrugated

To connect the sheets with each other, use special samphs for the roof, which making a uniform half-meter step, screw into the crest of the waves. Fill fasten sheets will need to be made after you make sure they are aligned relative to the sink line. The skate and about the sweep of the profile sheets must be fixed on the crate at the bottom of the wave. Self-tapping screws are attached in this case in each second wave. The profiled sheet on the end is fastened to each reshet at the bottom of the wave.

From what purses the sheet of professional flooring is chosen as a coating, the frequency of the middle of the sheet, usually, is made in a checker order. Self-tapping screws are screwed on one square meter of five pieces.

If the laying is performed in several rows, you can lay the profiled sheets in different ways:

  • Vertical Laying -Laying the first sheet of the lower row and the temporary fastening is performed. The first sheet of the second row is made in the same way. Then the second sheets of the first and second series are aligned alternately. As a result of four sheets, the unit is obtained. In the same order, the next block is lined. This method of laying is more suitable, in case of covering the roof of the roof with a groove for drainage.
  • Method of laying by blocks consisting of three sheets -In the lower row, the laying of two sheets, which be bonded with each other. Then the sheet is stacked in the second row, which docks to the sheets of the lower row. The block is equal to the eaves and firmly fixes. The next block is laid out in the same sequence. Usually, laying in this way is made by sheets that do not have drainage grooves.

You can check out the correctness of your actions by comparing them with what is shown on the video "Roof from the professional flooring with your own hands: the tips of the experienced", which is located at the bottom of this article. We draw your attention to the fact that the weight of profiled sheets is small, as a result, it is necessary to avoid high loads, therefore, it is necessary to move around the roof from the corrugated floor.

5. Proper fulfillment of the installation of the end and riding planks

Figure 8. Installation of the skim plank

The length of the end layer should be two meters. If you need to increase by 10 cm, the planks are connected to the brass. Experts advise, put the end planks towards the skate from the ovel of the roof. An excessive length can be removed from the skate. In the roofing sheet, as a result, one of the waves should be covered with an end strip. Planck is attached to the end board, and to sheets of professional flooring. Molding with self-draws with a uniform meter step.

Smooth skate elements are best suited for performing a skim plank. Experts advise, lay an additional seal between the coverage sheets and smooth elements of the skate, which must necessarily be ventilated. Laying the skate seal is made in the event that the sheets have enough corrugations.

6. Skown knot and its installation

The backstage when laying the skate slats should be over 10 cm. Support sheets are attached to the profiled sheets, the uniform step should be less than 30 cm.

7. Plank adjoining: Installation and device

Figure 9. Installation Plank adjoining

Planks of adjoining, two meters long, must be laid with twenty centimeter adhesive. It is necessary to strengthen the adjoining bar with the help of self-stems from the side, where it comes to sheets of professional flooring, while the uniformity of the step should be more than 40 cm. For mounting to the wall, it is possible to use the stroke or make it so that it is hidden.

Once again it is necessary to recall that the roof installation of the roof from the professional flooring should be considered with full responsibility and strictly perform step-by-step instructions.

8. Registration of the roof adjustment to the wall

Figure 10. Installation of roof adjustment to the wall

On the recommendation of specialists, use the skate seal during the work when you start connecting the roof end with the wall. It is necessary to put it between the top edge of the professional leaf and the joint of the junction. In the event that the gentle roof is adjacent to the wall with a side it is more convenient to lay the seal longitudinal, it will not allow the snow to be clogged into the gap. But it is worth noting to do it inappropriate if the installation is made on a steep roof.

In this article, we tried to convince you that if you wish, it is quite possible to cope with independently with the installation of the roof of the roof from the corrugated floor, while knowing a number of rules and secrets of this work will not prevent.

Video on the topic "The roof of a professional flooring: Tips for experienced":


Reading time ≈ 4 minutes

The construction of the roof from the corrugated floor is considered the most affordable and simple method of arranging roofs in a private house. This building material is easy, resistant to corrosion and with its installation will cope any man without attracting for the construction of hired workers. Our tips will help you make a roof from the professionalist with your own hands and save money.

Preparation for mounting

Before starting work, prepare the following materials and tools:

  • roulette, level and knife;
  • drill, screwdriver, hammer;
  • building stapler, metal scissors;
  • roofing screws with a size of 4.8 × 35, 4.8 × 60 or 4.8 × 80 m;
  • wooden bars for crate;
  • profiled sheets.

Think how you will serve the sheets on the roof. To do this, you can use lags, winches or blocks. To eliminate accidents, use special mounting belts and insurance cables and work in shoes that does not slide.

In order for the roof from the professional flooring with their own hands, it turned out a durable and reliable, when choosing a material brand, consider the features of the climate of your area. The ideal option for the roofs of private houses of any areas is the brands of LS44 and NS35 brands.

Production of crates and vaporizolation

1. Production of crates. For the crate, take wooden bars, they are easier than metal and more conveniently assemble. You can take boards of ate, pine, oak or alder. First, treat them with an antiseptic so that the roof does not have fungus and refractory composition. At this stage, the construction of the roof from the professional flooring is desirable to mount special membranes necessary for vapor barrier. The shap is mounted on the rafter system.

Call the following points when installing the crate:

  • first, strengthen along the cornice of the first board, which should be thicker than the rest. Board Mount to special rails, nailed to sling feet. Reiki go perpendicular and they need to provide ventilation clearancerequired for the professional sheet. Read the onset of the rest of the boards. It is convenient to start the mount from the bottom, gradually climbing to the top;
  • the design of the crates is collecting using nails or screws. For fastening boards to concrete, a dowel-nails are used;
  • pitch between bars, select depending on the corner of the roof and the size of the profile. Usually a step is 50-100 cm.

2. Parosolation. Parosolation does not allow to accumulate under the roof moisture. This is a special film with membranes that are produced by steam and do not give to lean moisture. Place the film before starting the installation of the roof of the roof from the corrugated floor. Steamproofing sheets lay the flashes, they are attached to special self-drawing.

Features of styling on the roof

Roofs for houses are single and double. Single Roof From the professional flooring requires the material and its design is much easier. Start the fastening of sheets on any roof from the bottom of the roof slide.

Highlights of work:

  • all sheets are attached to a wooden crate with roofing self-drawing. Laying begins from the edge. If something is incomprehensible - we recommend to look at the photo and video installation of the roofs, which will find in our article;
  • self-tapping screws strictly perpendicular to the plane of the roof, the breaks are unacceptable. Self-tapping screws are mounted in the bottom of the wave of the sheet. 7-8 self-tapping screws will be required for each sheet, the installation of the proflists is a mustache. The magnitude of the alternate of the adjacent sheets should be at least one wave;
  • first, it is advisable to secure the proflists with one self-tapping screw so that they can be corrected if it turned out not exactly. If a row is smooth, then secure reliably all sheets on the row of the wave. Boca is sewn with a special sheet after laying the entire row.

The house is a cozy Nestshko, where they are always waiting, feed and warm. To do this, it should be built, and then protect against wind and precipitation. Need reliable and inexpensive roof, and make it with your own hands it will be even better because you can be confident in the quality and observance of technology. For roofing works there are many materials, but the metal profile is the most popular of them. This is a budget and reliable material that looks beautiful and gently. In addition, it is easy to install and does not require special qualifications. Find out how to cover the roof of a professional flooring and make this work with your own hands.

In this article

Roof Types and Material Calculation

To understand how to cover the roof with your own hands, you need to find out what roofs come, and to construct it yourself. Choose the type of roof, according to your needs. From this depends on the consumption of material, the direction of water flow and thawing snow, as well as strength. The structure of the roof depends on the direction of the slopes, and it is divided into the following types:

  • three-terminal roof;
  • four-tailed roof;
  • double roof;
  • combined roofs.

When designing a system of rafters and before covering a professional flooring, it is necessary to take into account not very large weight of the whole design, so too powerful beams are not needed.

The angle of slope should be from 12 degrees and more. The larger the tilt, the smaller the load on the rafters and the fence, as well as the less consumption of the bar and professional flooring. If, at angles of 12-15 degrees, the distance between the elements of the bags of 400 mm, then for inclination above 15 degrees, the distance between the 600 mm bruises and more is required.

How to use professional flooring how to cover the roof? It is possible to put sheets with a falsestone in one wave, and put the upper sheet to the bottom with the overlap of 180-200 mm. For the convenience of work when attaching the root, it is necessary to make a template equal to the distance between the bar. The roof coverage of the corrugated floor implies that all wooden elements must be treated with flame retardant and bioprotective compositions.

The most important stage of work is the production of measurements and the calculation of the material. It is necessary to measure the skates diagonally, and these values \u200b\u200bshould not disperse more than 20 mm. Also important to the plane of the rods, such a measurement makes the level using the cord, here for every 5 m possible deviation is not more than 5 mm, otherwise the sheets are not joined. Then the amount of metal profile is calculated, where the length of the eaves is measured and is divided into the width of the sheet, taking into account the allen on one wave.

When calculating the number of professional flooring from the skate to the skate, it is necessary to take into account the overlap of sheets in 180-200 mm. A complex roof will be useful to split on geometric shapes and calculate them separately and then summarize. Separately, it is necessary to take into account the windows, pipes, skates and ends. It is important to take into account the ot from the skate, which should be at least 50 mm.

The structure of the roof

In difficult weather conditions of Russia, the problem, how to properly cover the roof of a professional flooring, you need to decide with the insulation and vaporizolation. Standard technology involves insulation mineral Vata. Interpartine space and vaporizolation. Then it is necessary to put a hydrobarier, which is a membrane film. It stacked directly on rafters and allows you to remain dry previous layers.

After laying the waterproofing layer, a controlled control is styled, which passes along the rafter and on top of the waterproofing of 25 × 40 mm bruises. Next, it is hampered in a step, depending on the angle of inclination of the roof. Spresting the racks of dohes only on rafters. In places of pipe output, on endowes, ice skating and cornice, we make a solid doom or put additional bars.

Further, the profiled sheet is stacked in compliance with all the rules that will be described later. Thus, before the roof of the roof is a professional flooring, you need to produce certain preparatory workas follows:

  • installation of a vapor insulating layer to prevent moisture from entering the insulation layer;
  • laying the thermal insulation layer to compensate for the temperature difference in both hot and cold weather;
  • installation of the waterproofing membrane, which is used as an additional insulation, waterproof surface and protects against condensate, thereby providing a long service life of the roof;
  • the device is the control and dooms required for the roof ventilation and increasing the strength properties.

Tools and auxiliary materials

In order to properly cover the roof with your own hands, you need to work out your approach to this process. A competently chosen tool will be a serious help and improve quality, as well as increase the mounting speed. Let's deal with what tool is needed and why.

In the production of roofing works, you will need a very difficult set of tools, namely:

  • the measurement set, which includes a tape measure, level and cord;
  • set for cutting and marking, including a knife, pencil or marker;
  • skit and electrical scissors for metal;
  • building stapler and gun with sealant;
  • electric drill;
  • rechargeable screwdriver with bat;
  • rubber hammer;
  • soft brush.

Metal Poll S. polymer coating does not have resistant to high temperatures, Therefore, it is not recommended to use welding and grinder when installing. To ensure a long service life of the roof, the locations of the cuts with the depth must necessarily process the anti-corrosion composition. It should be borne in mind that the work on the roof is a traumaous process. When the coverage is stripped and assembling, it is very important to comply with safety and work only in protected gloves or mittens.

The profiled sheets are attached to the shells with self-strokes with a rubber gasket that does not allow moisture to penetrate through the mounting hole. They can be galvanized electrolytic way or covered with powder paint. Self-tapping screws It is desirable to select the same colors as the coating sheets, because they are less noticeable. The auxiliary materials also include special, polyurethane foam seals with adhesive adhesive composition. They are made with perforation to provide better ventilation of the underpants space.

Installation of professional flooring

When lifting sheets in place of installation it is important to use wooden lags to not damage interior surface Flooring and avoid further corrosion. The huge risk of roof damage occurs when large areas are covered. At this time, it is necessary to move only in soft shoes and with caution. It is also not worth carrying out work in windy weather, as you can not only damage the sheet, but also harm the health of others. You can use a soft brush to remove garbage.

We are considered preparatory stage Walking professional flooring, and how to cover the roof? There are several ways that we must summarize and offer best option. When the skate in the form of a trapezoid or triangle is recommended to first lay a sheet in the center of the eaves, and then retain sheets in both directions. No need to forget that Svet must be at least 50 -70 mm. Otherwise, if the coating consists of several rows, you just need to observe the laying odor.

Careful laying of the first sheet leads to the right laying of all others, so it needs to pay special attention. The first sheet of the metal profile should be aligned to the end of the roof and eaves, check the level of horizontal and secure the self-tapping screw at the top of the profile. After that, fasten to the end to each bar of the root and in every wave on the eaves. The following sheets are attached through a wave in a checker order. The top row sheets are put on the lower with a twist of 180-200 mm. Horizontal backstage fasten into each wave, the same thing in all edges of the roof. Frontal Sve is desirable to make 50-70 mm equal.

At the same time, the method is properly covered with a roof of a professional flooring, a neat and reliable roof is obtained. An important element of the final installation is the operation of fastening the skate elements and end slats, as well as snowstanders. When mounting the skate, it is necessary to observe step 300-500 mm and wrapping the screws into the upper bending of the sheet, with the flax plane 50-100 mm. Wind elements need to cover the same way. No need to forget about self-adhesive seals and sealing of junctions between the roof and the auxiliary elements.

Option of the device of the cornis

Thus, it was described here how to properly cover the roof of a professional flooring. To make this work itself, having received not only significant savings, but also high moral satisfaction, from a well-made roof. Let her serve you for many years.

mOB_INFO.